Gas Injection Core Flood System
Send a request
CT-EOR-GAS
Gas Injection Core Flood System
Function. Automated, modular core flooding system to evaluate the efficiency of gas-injection EOR.
Controlled. Confining and pore pressure; temperature; gas injection.
Measured. Recovery and gas breakthrough.
Pressure and temperature ratings, wetted materials, modules and instrumentation are configured per project. Guaranteed performance and included hardware are stated only in the project-specific technical proposal and approved datasheet.
Features
- Maximum confining pressure: 700 bar (10,000 psi)
- Maximum pore pressure: 700 bar (10,000psi)
- Maximum working temperature: 150°C
- Core diameter: 1”5 (other upon request)
- Core length: 4” to 6” (other upon request)
- Pressure taps: 3 (other upon request)
- Wetted parts: Hastelloy
- Position: Horizontal and vertical
- Power supply: 220VAC, 50Hz
- Air requirement: 7 bar (100 psi)



